How to use this checklist
Buying an apartment that is still being built means trusting a developer with your money for months or years before anything exists that you can register as yours. This checklist turns the checks in our guide to checking a developer into twenty statements you can answer one by one, for one project at a time. Work through them as the documents arrive: the registry extract for the plot, the construction permit, the draft contract, the specification. For each line choose Yes if you hold the document or the written answer that proves it, No if the document shows the opposite or the developer refused, and Not yet if the question is still open. The summary counts your answers, lists the open points and gives one of three results.
Nothing you enter leaves your device. The checklist runs in your browser and remembers your answers in this browser only, so you can close the page after one meeting with the developer and continue after the next; Start again clears them. To keep a record elsewhere, send the summary to yourself or to your lawyer with the WhatsApp button, or print the page.
What the three results mean
- Stop. One of the four statements about the land and the permit is answered No. These are the checks that decide whether the apartment you are buying can lawfully exist and be registered to you. A No here is not a matter for negotiation over price; it is a matter for a lawyer, before any payment.
- Not ready to sign. Nothing critical has failed, but at least one answer is No or Not yet, or some lines are unanswered. The list under the result shows exactly which. Send the developer those points in writing and wait for documents, not reassurances.
- All twenty checks passed. Every statement is answered Yes. That is the point at which a lawyer's reading of the full contract is worth paying for, not a replacement for it.
Why four checks can stop a purchase
Most of the twenty lines measure how careful and transparent a developer is. Four of them measure something harder: whether the building has a lawful basis. If the developer neither owns the plot nor holds a written right to build on it, the apartments may never be registrable. If the plot is under seizure, it cannot be freely disposed of until the seizure is lifted. If there is no construction permit, or the permit describes a smaller or different building, the floors being sold beyond it are unauthorised construction. Georgia's Spatial Planning Code issues permits in two stages, or three where the architectural design is approved first, and a building may not be used before its commissioning act, which is why the permit and its stage matter from the first payment.
Where each answer comes from
| Lines | Document or source | Who gives it to you |
|---|---|---|
| 1-2 | Record of the company in the register of legal entities | Public Registry, on request; or the developer |
| 3-4 | Addresses of finished buildings; commissioning dates | The developer, then your own visit; in Tbilisi, the City Hall map of commissioned and suspended sites |
| 5-6 | Public Registry extract for the plot's cadastral code | Public Registry; your lawyer can order it |
| 7-10, 12 | Construction permit and its conditions; design and supervision details | The developer; the municipality's records |
| 11 | Written construction schedule | The developer; compare it on site |
| 13 | Statement of how the project is financed | The developer, in writing |
| 14-16, 18 | Draft contract and its specification annex | The developer; read with your lawyer |
| 17 | Application to register a preliminary ownership right | Public Registry, standard fee |
| 19-20 | Name of the future management company; target dates | The developer, in writing |
How to read the extract itself, line by line, is explained in our guide to the Public Registry extract, and the clauses behind lines 14 to 18 in the guide to the developer contract.
How to ask the developer for what is missing
Ask once, in writing, for everything on your open list, and keep the replies. A short message works better than a long one: name the project and the unit, list the documents you need by their proper names (the registry extract for the plot, the construction permit with its stage, the draft contract with the specification, the construction schedule, the name of the company that will sign), and ask for them by a date. Ask for copies, not descriptions. A developer with nothing to hide usually sends most of them within days; one who answers with a brochure, a promise or pressure to reserve quickly has answered the question in another way. If you work with a lawyer, send the developer's replies to the lawyer unchanged.
Reading a mixed result
Few projects pass all twenty lines at the first attempt, and a Not yet on the management company or the target registration date is ordinary early in construction. What matters is the pattern. Open points that close quickly with documents are a good sign. The same point that stays open after two written requests is a bad one. Several No answers in the money and contract group usually mean that the contract protects the developer more than the buyer; that can be fixed in negotiation, and the guide to the developer contract shows the wording to propose. Answers in the company group tell you how much weight to put on the developer's promises about everything else.
Comparing two or three projects
The checklist is most useful side by side. Fill it in for each project you are considering, send each summary to yourself, and compare the open lists rather than the counts. Two projects with the same number of Yes answers can differ completely: one may be missing only the name of the future management company, the other the construction permit. Prefer the project whose open points are about the future, such as dates still to be fixed, over the one whose open points are about the present, such as documents that should already exist. If the projects are similar on paper, the developer's record in lines 3 and 4 is usually the best tie-breaker, because it is the only part of the checklist that shows what the company has actually done rather than what it says it will do.
What this checklist cannot tell you
A checklist confirms that the right documents exist and say the right things. It cannot confirm that a document is genuine, that a signature is authorised, that the developer has the money to finish, or that the contract's clauses are enforceable as written. Those are questions for a lawyer, and for buyers abroad the legal due diligence service covers them. It also does not judge the apartment itself, its price or its prospects as an investment; the instalment calculator and the investment guides cover those.
Frequently asked questions
Does the checklist save my answers?
Only in your own browser. The answers are remembered on this device so you can return to them, nothing is sent to us, and Start again deletes them. It holds one set of answers at a time, so keep the WhatsApp summary of each project you check.
Can I use it for a finished building?
Partly. For a building already commissioned and registered, the purchase works like a resale, and the registry extract for the unit itself replaces most of the permit questions.
What if the developer will not show the permit?
Answer line 7 with No. A developer selling apartments should be able to show the permit for the building being sold; refusal is a reason to stop.
Is a bank mortgage on the land a problem?
Not in itself; banks often finance construction against the land. What matters is a written commitment on how your unit will be released from the mortgage when it is registered to you.
Why does registering a preliminary ownership right matter?
It puts your claim to the unit on the public record before the building is finished, and the Public Registry does it for its standard fee. A developer who objects is telling you something.
How long does the checklist take?
Answering takes a few minutes; collecting the documents behind the answers usually takes days or weeks, which is why the Not yet option exists. Come back and update the answers as each document arrives.
Can I send my answers to my lawyer?
Yes. The WhatsApp button sends the counts, the result and every open point in one message.
Sources
- Spatial Planning, Architectural and Construction Activities Code of Georgia (Articles 96, 101, 111, 112, 139.1, 140), Legislative Herald of Georgia (accessed 13 October 2026)
- Law of Georgia on the Public Registry, Legislative Herald of Georgia (accessed 13 October 2026)
- National Agency of Public Registry, extracts and preliminary ownership registration (accessed 13 October 2026)
- Tbilisi launches map to verify construction project status, Georgia Today, 27 November 2025 (accessed 13 October 2026)
Change log
- - Interactive checklist published, built on the twenty questions of the developer guide.